Add new changes to pipeline stages in LeadConnector to Google Sheets row(s)
Automatically back up and store any new changes to your LeadConnector pipeline in a row or rows in Google Sheets. This Zap gives you an easy way to ensure that your updates are backed-up and easy to manage, without the need for manual copying and pasting.
Automatically back up and store any new changes to your LeadConnector pipeline in a row or rows in Google Sheets. This Zap gives you an easy way to ensure that your updates are backed-up and easy to manage, without the need for manual copying and pasting.
- When this happens...Pipeline Stage Changed
Triggers when the pipeline stage was updated for an opportunity.
- automatically do this!Create Spreadsheet Row
Create a new row in a specific spreadsheet.
- Free forever for core features
- 14 day trial for premium features & apps
In PipelineRequired
Moved to Stage
Try ItFirst Name
Last Name
Full Name
Phone Number
Email
Address
City
State
Country
Postal Code
Tags (comma delimited string for multiple tags)
Source
Mark as LeadRequired
Notes
Select PipelineRequired
Select StageRequired
Assign to User
Phone Number
Email
First Name
Last Name
Full Name
Drive
SpreadsheetRequired
WorksheetRequired
Try It
First Name
Last Name
Full Name
Phone Number
Email
Address
City
State
Postal Code
Tags (comma delimited string for multiple tags)
Source
Mark as LeadRequired
Notes
Business Name
Country
Date Of Birth
CampaignRequired
First Name
Last Name
Full Name
Phone Number
Email
Address
City
State
Postal Code
Tags (comma delimited string for multiple tags)
Source
Lead Source
Notes
Event Time (Must be in ISO 8601 format ie. 2019-02-08T13:35:00-08:00)
Assign to User
Task TitleRequired
Task DescriptionRequired
Due Date (Must be in ISO 8601 format ie. 2019-02-08T13:35:00-08:00)
First Name
Last Name
Contact Phone
Contact Email
No Team Drive
SpreadsheetRequired
WorksheetRequired
Try It